AGP Picks
View all

Garrison Flood Control gets FM approval for Hammerhead flood plank system

Oct. 23, 2026
Garrison Flood Control gets FM approval for Hammerhead flood plank system
By AI, Created 14:15 UTC, Oct 23, 2026, AGP -

Garrison Flood Control’s Hammerhead Aluminum Flood Plank System has earned FM Approval under FM 2510, a third-party certification that verifies performance against flood-mitigation standards. The approval gives property owners, engineers and facility managers independent evidence that the removable barrier can perform under specified flood conditions.

Why it matters: - FM Approval under FM 2510 gives Hammerhead third-party validation for flood performance, which can matter for specifications, insurance requirements and building-code compliance. - The certification strengthens Garrison Flood Control’s position in the market for engineered flood protection systems. - Property owners, engineers, architects and facility managers now have independently verified evidence tied to Hammerhead’s tested flood resistance.

What happened: - Garrison Flood Control announced that its Hammerhead® Aluminum Flood Plank System earned FM Approval under FM 2510, the Examination Standard for Flood Mitigation Equipment. - FM granted the approval on Oct. 19, 2026, under Approval Identification PR472193. - The approval covers approved Hammerhead configurations that met FM Approvals’ testing and performance requirements. - The company posted a product page at more information for the FM Approved Hammerhead system.

The details: - FM 2510, also referenced as ANSI/FM 2510, sets testing and certification requirements for flood mitigation equipment designed to protect structures from flooding. - The standard includes physical performance testing, engineering assessments, material examinations and quality assurance requirements. - FM 2510 incorporates applicable ASTM 2510 International test methods for certain product and manufactured component material evaluations, including rubber, elastomers, marine-grade parts and other materials used in flood protection equipment. - For opening flood barriers like Hammerhead, the examination focuses on water resistance, structural integrity, impact resistance, deployment and continued functionality under simulated flood conditions. - Hydrostatic testing requires barriers to withstand sustained water pressure without exceeding leakage limits. - At maximum design water depth, FM 2510 requires the water level to be maintained for at least 20 hours. - Lower-water-depth testing is also used where applicable to assess sealing performance under different flood conditions. - The allowable leakage rate is no more than 0.08 gallons per hour per linear foot of seal, measured over 15-minute periods. - Dynamic impact testing requires opening barriers to withstand at least two impacts of 600 joules each from a rigid falling object designed to simulate floating debris. - Any damage from impact testing cannot compromise the barrier’s functionality. - After impact testing, FM 2510 requires additional hydrostatic testing to confirm continued water resistance. - FM 2510 also reviews deployment procedures, product documentation, component specifications and material performance requirements. - The examination includes checking installation instructions, verifying tested components against approved engineering specifications and assessing the manufacturer’s ability to produce systems consistent with the certified design. - FM Approvals’ official examination report says Hammerhead successfully met the applicable FM 2510 testing and evaluation requirements. - Hammerhead is a removable flood barrier designed to protect openings in residential, commercial and institutional properties. - The system uses stackable aluminum planks that fit between vertical aluminum U-channel posts anchored to the surrounding structure. - Specialized sealing components are used to help limit water infiltration along the planks, mounting channels and ground surface.

Between the lines: - The approval is not just a product milestone. It also signals that Hammerhead can be written into specifications where independently verified flood performance is required. - FM Approval carries ongoing obligations, including surveillance audits, production documentation controls and checks that manufactured products stay consistent with the approved design. - Garrison is framing the certification as support for broader compliance goals tied to FEMA and building-code standards, especially as ASCE 24-24 is expected to replace ASCE 24-14 in state codes.

What's next: - Garrison Flood Control said the approval may allow Hammerhead to be specified for municipalities or insurance companies that require ASTM 2510 approved opening flood barrier systems. - The company will need to maintain FM’s ongoing quality and manufacturing requirements to keep the approval. - Garrison says the certification supports its broader mission to help residential, commercial and institutional properties improve flood preparedness.

The bottom line: - Hammerhead now has a third-party certification that can make it easier to specify, approve and trust in flood-prone projects.

Disclaimer: This article was produced by AGP Wire with the assistance of artificial intelligence based on original source content and has been refined to improve clarity, structure, and readability. This content is provided on an “as is” basis. While care has been taken in its preparation, it may contain inaccuracies or omissions, and readers should consult the original source and independently verify key information where appropriate. This content is for informational purposes only and does not constitute legal, financial, investment, or other professional advice.

Sign up for:

American Consumer Products Digest

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.

Share this page:

Advanced Search Options

Search for:

Search scope:

Type:

Search in:

Date range:

The last

Sort by:

Sign up for:

American Consumer Products Digest

The daily local news briefing you can trust. Every day. Subscribe now.

By signing up, you agree to our Terms & Conditions.